The Jamaica Social Investment Fund now invites bids from eligible and qualified bidders for the National Drought Mitigation Project- Cluster 1, Cluster 2 and Cluster 3 as follows:
PROJECT – CLUSTER 1: National Drought Mitigation Project – Portland
Lot 1: Bid # 21183 – NDMP Rainwater Harvesting Package 1A – Portland – Mount Pleasant, Mullet Hall, and adjoining areas
Lot 2: Bid # 21184 – NDMP Rainwater Harvesting Package 1B – Portland – Snow Hill, Windsor Forest and adjoining areas
Lot 3: Bid # 21185 – NDMP Rainwater Harvesting Package 1C – Portland – Fellowship, Port Antonio, and adjoining areas
Lot 4: Bid # 21186 – NDMP Rainwater Harvesting Package 1D –
Portland – Manchioneal, Kensington and adjoining areas
PROJECT – CLUSTER 2: National Drought Mitigation Project – St. Thomas
Lot 1: Bid # 21170 – NDMP Rainwater Harvesting Package 2A – St. Thomas - Yallahs, White Hall and adjoining areas
Lot 2: Bid # 21171 – NDMP Rainwater Harvesting Package 2B – St. Thomas – Seaforth, Cedar Valley, and adjoining areas
Lot 3: Bid # 21172 – NDMP Rainwater Harvesting Package 2C – St. Thomas – Duckenfield, Dalvey and adjoining areas
Lot 4: Bid # 21173 – NDMP Rainwater Harvesting Package 2D – St.
Thomas – Amity Hall, Dumfries and adjoining areas
PROJECT – CLUSTER 3: National Drought Mitigation Project – Clarendon
Lot 1: Bid # 21174 – NDMP Rainwater Harvesting Package 3A – Clarendon – New Ground, Sangsters Heights, and adjoining areas
Lot 2: Bid # 21176 – NDMP Rainwater Harvesting Package 3B – Clarendon – Chapelton Road, Beckford Kraal and adjoining areas
Lot 3: Bid # 21175 – NDMP Rainwater Harvesting Package 3C – Clarendon – Mocho Road, Darlow and adjoining areas
Lot 4: Bid # 21177 – NDMP Rainwater Harvesting Package 3E – Clarendon – Crofts Hill, James Hill and adjoining areas
Lot 5: Bid # 21178 – NDMP Rainwater Harvesting Package 3F –
Clarendon – Aenon Town, Bog Hole and adjoining areas
Scope of Works: 1. Construction of 107, 5ft. x 5ft. x 2in reinforced concrete plinths to
include all excavations, formwork, and fill as per the drawing provided.
2. Erection of guttering as detailed in drawings provided
3. Placement of one hundred and seven (107) 400 US gallon water tanks,
including all associated plumbing works for the harvesting of rainwater
run-off collected by the guttering installed at each household.